Clare Solar Farm

FRV.png

The 125 MW dc solar plant started generating its first kWh in 2018 and has been operating ever since being connected to the grid via the Clare South substation immediately adjacent to the solar farm site.Construction commenced in 2016 and in 2017 FRV signed an agreement with a consortium consisting of Lighthouse Infrastructure and DIF for the sale of the solar plant, which continues to be operated and maintained by FRV.

 

Size: 125 MW | Annual Production: 263,100 MWH | Site: 300 Hectares.

​

QENCOM’s scope included: Engineering | Procurement | Construction Management | Commissioning   for the following:

  • 33kV AC reticulation and Infrastructure (RMU, Power Transformers)

  • DC reticulation

  • Primary Plant – Inverters, transformers, DC Systems

  • Secondary Systems and Protection Systems

  • Communications and SCADA

The included:

  • EPCM team of 73 + Staff including:

 

  • Procurement Engineering and administration

  • Design Engineers and Drafting – Electrical, Structural, Civil, Comms and SCADA

  • Electrical and High Voltage – Testing and Commissioning Technicians (Primary, Secondary, Communications)

  • Specialist Transformer Commissioning technicians

 

  • Detailed engineering, including electrical and structural designs, adhering to local regulations and industry standards

  • Implemented innovative solutions to enhance efficiency and mitigate potential challenges

  • Worked closely with the client and other stakeholders to address concerns and ensure seamless integration with the network

  • Provided ongoing support during the construction and commissioning phases, ensuring successful project delivery and grid performance