Mitchelton TSC

QR.png

 

This included the installation and upgrade of additional power system infrastructure at Wulkuraka Feeder Station (an existing Feeder Station Site).  Key considerations included:

 

  • Introduction of new infrastructure (SFC, 25kV Switchgear, Overhead Traction Equipment)

  • Working around a live and operational railway

  • Brownfield interface for construction

  • Construction and staging for commissioning

This project was successfully completed with 0 LTI's and to an exceptional level of quality.

 

 