Mitchelton TSC
This included the installation and upgrade of additional power system infrastructure at Wulkuraka Feeder Station (an existing Feeder Station Site). Key considerations included:
-
Introduction of new infrastructure (SFC, 25kV Switchgear, Overhead Traction Equipment)
-
Working around a live and operational railway
-
Brownfield interface for construction
-
Construction and staging for commissioning
This project was successfully completed with 0 LTI's and to an exceptional level of quality.